A well-run PIM selection takes about 12 weeks from mobilisation to a board-ready decision, following the PIMvendors method. Add preparation time when the business case and stakeholder alignment do not exist yet. Selections that skip the requirements and data model weeks take longer, because the team defines requirements while vendors are already demoing.

A PIM selection takes about 12 weeks with the PIMvendors method, measured from mobilisation to a board-ready decision. The first four weeks define the requirements and data model, and the remaining weeks test every vendor on those same requirements and scenarios.

The 12-week plan in the PIMvendors method:

  1. Weeks 1 to 4: mobilise, baseline, validated requirements and the target data model.
  2. Week 5: longlist to a shortlist of 3 to 5 vendors.
  3. Weeks 6 to 7: RFP and scenario script built on the buyer's sample data.
  4. Weeks 8 to 9: scenario-based demos on the buyer's own sample data.
  5. Weeks 10 to 12: reference checks and a proof of concept with the top 2 vendors, negotiation and the final recommendation.

Weeks 3 and 4 hold the core data model work. A business case and stakeholder alignment that do not exist yet add preparation time before week 1. PIMvendors estimate: 4 to 8 weeks of preparation for a mid-sized company starting from spreadsheets.

Three things slow selections most: requirements written during demos, missing decision makers at scenario sessions, and procurement steps added late. Plan the steering committee dates in week 1, and the 12 weeks hold.

In 2025 PIMvendors helped 15+ companies select a PIM through a full selection or a shortlist.

Other questions at this stage

Want a second pair of eyes on your selection?

PIM Selection is published by PIMvendors.com, which runs scenario-based PIM selections for European manufacturers, distributors and brands. A 30-minute call is enough to see whether that helps.

See PIMvendors selection servicesBook a call with PIMvendors

Sources and method

How this page was made: drafted by the PIM Selection editors from the sources listed, checked against the PIMvendors selection method, and signed off by a named expert. Editorial policy.

Cite this page

PIM Selection (2026). How long does a PIM selection take?. PIMvendors.com. https://pimselection.com/ask/how-long-does-pim-selection-take/ (version 2026-10-14).