Proof of concept: definition and role in PIM
Proof of concept is a time-boxed evaluation that lets the two finalist vendors configure the buyer's critical scenarios in a working environment before contract.
In PIM practice, a proof of concept goes deeper than a demo. The vendor or partner configures part of the buyer's data model, loads real sample data and connects one integration. The buyer's team then works in the system. The goal is to test the riskiest requirements under realistic conditions.
Illustrative example: a manufacturer down to two finalists runs a three-week proof of concept with each. Both configure the two most complex product families, import ERP data and export to the webshop. The steward team then works in each system for a week.
In a selection, a proof of concept costs time and sometimes money, so it belongs at the end and focuses on deal-breakers. Buyers should define success criteria in advance and agree whether the vendor charges for the work and who owns the configuration afterwards.
Related terms
Sources and method
How this page was made: drafted by the PIM Selection editors from the sources listed, checked against the PIMvendors selection method, and signed off by a named expert. Editorial policy.
Cite this page
PIM Selection (2026). Proof of concept: definition and role in PIM. PIMvendors.com. https://pimselection.com/glossary/proof-of-concept/ (version 2026-10-14).