Running a PIM proof of concept with the top 2 vendors
A PIM proof of concept is a short, time-boxed test of one or two high-risk requirements that the scenario demos left unproven. In the PIMvendors method it runs in week 10 with the top 2 vendors, on the buyer's own data, with pass criteria written before work starts. It confirms the decision and keeps commercial tension alive.
When does a PIM selection need a proof of concept?
A PIM selection needs a proof of concept when a high-risk requirement remains unproven after the scenario demos, or when the top 2 vendors score too close to call. In other cases, reference checks and the demo evidence are enough.
The proof of concept runs in week 10 of the 12-week PIM selection process, alongside the reference checks. By then, scenario demos have reduced a shortlist of 3 to 5 vendors to two. The proof of concept tests what a half-day demo cannot show.
Typical triggers in PIMvendors selections:
- A complex variant model with three or more axes and deep inheritance.
- An ERP integration pattern with split mastering per attribute.
- Performance at full catalogue size, such as bulk edits on hundreds of thousands of products.
- A compliance data model that the demo only showed in part, such as packaging components.
- An AI use case whose quality on your data was promising but not measured.
If none of these apply, skip the proof of concept and spend week 10 on deeper reference checks. A proof of concept without a clear question costs time and gives the vendor a reason to think it has already won.
What should a PIM proof of concept test?
A PIM proof of concept should test one or two requirements, chosen for risk and business weight, with measurable pass criteria. Breadth was covered by the RFP and the demos. The proof of concept goes deep on the point that could break the project.
Write the scope as a short brief:
| Element | Example |
|---|---|
| Question | Can the platform hold our machine and spare-part model with typed relationships at full scale? |
| Data | 20,000 products, 150,000 relationships, from the buyer's ERP extract |
| Actions | Load, model, bulk-edit, export to the webshop format |
| Pass criteria | Load in under 2 hours; bulk edit of 10,000 relationships in under 5 minutes; export validates |
| Who configures | Vendor or partner, with one buyer team member observing |
| Who judges | Product data owner and IT architect, against the criteria |
The criteria above are an illustrative example. Set your own from your requirement priorities and volumes.
Both finalists get the same brief, the same data and the same deadline. Different scopes make the results impossible to compare.
How do you run a PIM proof of concept in one week?
Run the proof of concept as a one-week sprint with a kick-off, daily check-ins and a closing review against the criteria. One week of active work is enough when the scope is one or two requirements (PIMvendors estimate).
| Day | Activity | Buyer effort (hours, estimate) |
|---|---|---|
| Before day 1 | Brief, data and environment access shared | 4 |
| Day 1 | Kick-off, data load, questions answered | 3 |
| Days 2 to 3 | Vendor or partner configures; daily 30-minute check-in | 2 |
| Day 4 | Buyer team tests against the criteria | 6 |
| Day 5 | Closing review, results recorded, open issues listed | 3 |
Assign one buyer team member to each proof of concept as the observer. The observer sees how much configuration the solution needed, who did it and how long it took. That effort tells you more about running costs than the final result.
Keep the proof of concept in a separate environment from any sales demo system. Ask the vendor to document every configuration step, so the effort can be assessed afterwards.
Who pays for a PIM proof of concept?
Paying for a proof of concept is reasonable when it needs real configuration or integration work, and the fee should be credited if you choose that vendor. A paid proof of concept gives the buyer control of the scope.
Free proofs of concept are common, but they shape behaviour. The vendor decides how much effort to invest, often focusing on what shows well. A modest fee makes the scope a commitment on both sides.
Negotiate three terms in writing:
- The fee, or a confirmation that the work is free.
- A credit of the fee against the first-year licence or implementation if you choose that vendor.
- Ownership of the configuration and documentation, so the work can feed the implementation.
When an implementation partner runs the proof of concept, the partner's team becomes part of the evaluation. Ask for the people who would run your project, and check that the partner names them in the proposal. The Red Flag Register lists partner warning signs, such as unnamed delivery teams.
How do you judge the proof of concept result?
Judge the result against the pass criteria written before the work started, and record the evidence for each criterion. Moving the criteria after the result is the most common way a proof of concept loses its value.
Use a simple outcome per criterion: passed, passed with conditions, or failed. A condition might be an extra module, a partner extension or a configuration that needs technical skills. Record the cost and effort of each condition.
Combine the result with the scenario scores and reference findings. A proof of concept rarely overturns a strong demo lead on its own. It does confirm or remove the remaining doubt about the leader, and it gives the board evidence for the riskiest part of the plan.
Share the result with both vendors. The vendor that passed knows the next step is commercial. The vendor that failed gets a fair chance to explain, and stays engaged as the fallback while you move into negotiation.
How is a proof of concept different from a pilot?
A proof of concept supports the decision before the contract, while a pilot supports adoption after it. Confusing the two leads to proofs of concept that run for months and pilots that start without a decision.
| Dimension | Proof of concept | Pilot |
|---|---|---|
| Timing | Week 10, before contract | After contract, early in implementation |
| Vendors | Top 2 | Chosen vendor only |
| Scope | One or two high-risk requirements | A first product range end to end |
| Users | Selection team | Real business users |
| Data | Sample or extract | Production data |
| Duration (weeks, estimate) | 1 | 4 to 8 |
| Goal | Prove fit, keep commercial tension | Prove adoption, refine the rollout |
A vendor that proposes a long pilot in place of a proof of concept is asking for a commitment before the commercial terms are settled. Keep the proof of concept short and comparable, and plan the pilot inside the implementation. The implementation pillar covers the pilot and the first 90 days.
A proof of concept should answer one question you could not answer in the demo. If you cannot write that question down, you do not need one.
Want a second pair of eyes on your selection?
PIM Selection is published by PIMvendors.com, which runs scenario-based PIM selections for European manufacturers, distributors and brands. A 30-minute call is enough to see whether that helps.
See PIMvendors selection servicesBook a call with PIMvendors
Frequently asked questions
Is a proof of concept always needed in a PIM selection?
A proof of concept is needed in a PIM selection only when a high-risk requirement remains unproven after the scenario demos, or when the top 2 vendors score too close to separate. Common triggers are a complex variant model, a demanding ERP integration pattern and performance at full catalogue size. When the demos already proved those points, reference checks alone may be enough.
How long should a PIM proof of concept take?
A PIM proof of concept should take about one week of active work, inside week 10 of the PIMvendors method. Longer proofs of concept drift into early implementation, raise costs on both sides and delay the decision. If one week is not enough, the scope is too broad. Narrow it to the one or two requirements that carry the most risk.
Should we pay for a PIM proof of concept?
Paying for a PIM proof of concept is reasonable when it needs real configuration or integration effort from the vendor or partner. A paid proof of concept gives the buyer the right to set scope and criteria. Negotiate that the fee is credited against the first-year licence or implementation if you choose that vendor. Free proofs of concept often come with vendor-controlled scope.
What is the difference between a PIM proof of concept and a pilot?
A PIM proof of concept tests whether a platform can meet specific high-risk requirements before the contract, in a short test environment. A pilot runs after the contract, with real users and a first product range in production. The proof of concept supports the decision. The pilot supports adoption and the rollout plan during implementation.
Sources and method
How this page was made: drafted by the PIM Selection editors from the sources listed, checked against the PIMvendors selection method, and signed off by a named expert. Editorial policy.
Cite this page
PIM Selection (2026). Running a PIM proof of concept with the top 2 vendors. PIMvendors.com. https://pimselection.com/process/proof-of-concept/ (version 2026-10-14).