PIM SelectionThe independent guide to choosing a PIM

The first 90 days after PIM go-live: hypercare to first results

The first 90 days after PIM go-live run in three phases: hypercare in the first weeks, stabilisation until about week six and optimisation until day 90. During this period the team fixes defects, clears migration leftovers, retires legacy spreadsheets and measures business case outcomes against the go-live baseline. Day 90 ends with a review and a release 2 plan.

What should happen in the first 90 days after PIM go-live?

The first 90 days run in three phases: hypercare, stabilisation and optimisation, each with its own goal. The period decides whether the PIM becomes the trusted source or a system people work around.

Phase Weeks Goal Key output
Hypercare 1 to 2 Keep channels running, fix critical defects Stable exports, defect log
Stabilisation 3 to 6 Clear migration leftovers, end partner dependency Support handover, clean backlog
Optimisation 7 to 13 Measure outcomes, remove workarounds, plan release 2 Day 90 review, release 2 plan

The weeks above are a PIMvendors planning convention for a mid-sized implementation. Larger programmes repeat the cycle per release.

The implementation pillar describes go-live as the start of the period in which the business case is won or lost. Three workstreams run through all three phases: stabilisation of the system, adoption by users and governance of the data. This page covers stabilisation and measurement. The user adoption and governance after go-live guides cover the other two.

Prepare the 90 days before go-live. Baseline measures, the hypercare team, the support model and the day 90 review date should all be fixed in the cutover plan.

How does PIM hypercare work?

Hypercare is a period of intensive, fast-response support right after go-live, run jointly by the partner and your team. Its goal is stable channels and a clear defect picture within days.

A hypercare setup has five elements:

  1. A named hypercare team: partner consultants, your PIM administrator, key stewards and an integration specialist.
  2. A single channel for issues, with triage by severity.
  3. A short daily stand-up during the first two weeks.
  4. Monitoring of exports, imports and integration jobs.
  5. Written exit criteria.
Severity Example Suggested response
Critical Channel export fails, ERP sync stops Same day
High Workflow blocks a product family Within two working days
Medium Incorrect validation rule Planned fix within hypercare
Low Usability improvement Backlog for release 2

Align these levels with the partner contract before go-live.

Hypercare should end when written criteria are met. Typical criteria are critical defects closed, exports stable for an agreed period and support handover documented. As a PIMvendors estimate, hypercare for a mid-sized implementation lasts four to six weeks.

Which measures show the PIM is working?

Measure the outcomes promised in the business case, against a baseline taken at go-live. Activity measures such as logins show use and say little about value.

Measure Unit Baseline source Expected direction
Time to market for new products Working days from creation to first channel Old process, sampled before go-live Down
Completeness per channel Percent of required attributes filled Migration reconciliation Up
Export errors Rejected records per export First week of production Down
Supplier onboarding time Working days per supplier file Old process Down
Shadow spreadsheets Count in active use Inventory before go-live Down to zero
Open defects Count by severity Hypercare log Down

Report weekly during the 90 days, to the product data owner and the sponsor. Show the trend alongside the current value. A completeness figure that rises each week tells the organisation the PIM is working.

The PIM ROI guide explains how these measures link to financial outcomes. The product data quality page explains how to define completeness per channel.

How do you clean up migration leftovers?

Turn every migration leftover into a work queue with an owner and a deadline. Leftovers that sit without an owner become permanent data quality problems.

Typical leftovers after cutover:

  • Products that failed validation and were migrated in draft.
  • Attributes left empty because the source had no data.
  • Free-text values awaiting conversion to code lists.
  • Broken asset links or relations.
  • Translations flagged as outdated.

Assign each queue to a steward by product domain. Set a weekly target and report progress alongside the outcome measures. Enrichment work belongs in the PIM's own workflows, where approval and quality rules apply.

Prioritise by channel impact. Products that block a channel export or a regulatory obligation come first. PPWR applies generally from 12 August 2026, so packaging attributes with gaps belong at the top of the list for affected products.

Some leftovers reveal design gaps. A queue that does not shrink, despite effort, often signals a missing attribute, a wrong validation rule or an unclear definition. Route those to the governance forum as data model change requests.

When do you decommission legacy systems and spreadsheets?

Decommission each legacy source once its data is migrated, its users work in the PIM and no channel depends on it. Leaving old sources available invites parallel maintenance.

Use a three-step sequence:

  1. Set the legacy source to read-only for migrated scope.
  2. Confirm no channel, report or integration still reads from it.
  3. Archive the data and switch the source off after the agreed retention period.

Shadow spreadsheets need a different approach. They survive because they solve a problem the PIM does not yet solve for that user. Interview the owner of each surviving spreadsheet. The answer is usually one of three: a missing PIM feature, a missing report or a training gap. Each answer has a fix.

The Prosci ADKAR model describes the last element of individual change as Reinforcement. Retiring old tools is reinforcement in practice: it confirms that the new way of working is the only way. Communicate each decommission date in advance and keep it.

How do you plan release 2 at day 90?

Plan release 2 at the day 90 review, from a prioritised backlog and the measured outcomes of release 1. The review closes the go-live period and opens normal operations.

The day 90 review agenda:

  1. Outcome measures against baseline.
  2. Open defects and leftover queues.
  3. Adoption by role, including surviving spreadsheets.
  4. Governance routine: change requests handled, forum attendance.
  5. Backlog for release 2, scored on business value and effort.
  6. Budget and resources for the next period.

The product data owner chairs the review, with the sponsor, partner lead and IT attending. The output is a written plan with owners and dates.

Release 2 often adds markets, channels, supplier onboarding or AI features. Use the product data maturity model to choose the next step. Move up one level at a time, and add scope only once the basics run reliably.

Keep the release 2 scope small enough to deliver within one quarter. A short second release keeps the project team together and shows the organisation that the PIM keeps improving after go-live.

Day 90 is when the business case gets its first real check. Measure the outcomes you promised in it.

Stephan SpijkersCo-founder, PIMvendors.com

Frequently asked questions

How long should PIM hypercare last?

As a PIMvendors estimate, hypercare for a mid-sized implementation typically lasts four to six weeks, with the most intensive support in the first two. Hypercare should end when agreed criteria are met: critical defects closed, exports stable for an agreed period, support handover documented and stewards working without daily partner help.

Which measures show a PIM is working after go-live?

Use measures from the business case: time to market for new products, completeness per channel, export error rates, supplier onboarding time and the number of shadow spreadsheets still in use. Take a baseline at go-live and report weekly during the first 90 days. Logins and training attendance show activity and say little about value.

When should we switch off legacy spreadsheets and systems?

Switch off each legacy source once its data is migrated, its users work in the PIM and no channel depends on it. Set the old system to read-only first, then archive and decommission after an agreed retention period. Spreadsheets that survive the first 90 days usually point to a missing PIM feature or a training gap.

What should the day 90 review cover?

The day 90 review compares business case outcomes with the baseline, lists open defects and migration leftovers, assesses adoption by role and confirms the governance routine is running. It ends with a prioritised backlog and a plan for release 2. The product data owner chairs it, with the partner and IT attending.

Sources and method

  1. Prosci: ADKAR model
  2. Regulation (EU) 2025/40 on packaging and packaging waste

How this page was made: drafted by the PIM Selection editors from the sources listed, checked against the PIMvendors selection method, and signed off by a named expert. Editorial policy.

Cite this page

PIM Selection (2026). The first 90 days after PIM go-live: hypercare to first results. PIMvendors.com. https://pimselection.com/implementation/first-90-days/ (version 2026-10-14).